February 10, 2024
Commercial Vessel Power Upgrade
Switchboard modernization and ground fault monitoring installation completed on-time and within budget.
Project Overview
A commercial cargo vessel operating in North Atlantic trade required comprehensive electrical system modernization to meet updated ABS classification requirements. The 15-year-old main switchboard had reached end-of-life, and new regulations mandated installation of ground fault monitoring systems.
The critical challenge was executing this major electrical upgrade during a scheduled 3-week drydock period without schedule overruns that would cost the operator approximately $45,000 per day in lost revenue.
The Challenge
Time-Critical Execution: The drydock schedule was fixed with multiple contractors working simultaneously. Any electrical delays would cascade through other trades, potentially delaying vessel redelivery.
Classification Requirements: Updated ABS rules required:
- Ground fault monitoring on all ungrounded systems
- Enhanced generator control and synchronization
- Improved bus-tie management with interlocks
- Complete documentation package for class approval
Aging Infrastructure: The existing switchboard showed signs of deterioration including corroded bus bars, failing circuit breakers, and inadequate fault protection. Complete replacement was necessary rather than refurbishment.
Operational Continuity: During installation, temporary power arrangements were required for critical yard services, lighting, and other contractors’ equipment.
Our Solution
SDCI Trust Group delivered a turnkey switchboard replacement solution:
Pre-Engineering: Six months before drydock, our engineering team:
- Conducted detailed site survey and measurements
- Prepared electrical single-line diagrams
- Designed custom switchboard to fit existing footprint
- Submitted technical documentation to ABS for approval
- Manufactured and tested switchboard at our facility
Custom Switchboard Design:
- 3-section main switchboard with 2x750kW generator feeders
- Integrated ground fault monitoring with alarm and trip functions
- Digital generator controllers with load sharing and synchronization
- Bus-tie section with mechanical and electrical interlocks
- Modern circuit breakers with enhanced short-circuit protection
- Comprehensive metering and monitoring instruments
Installation Strategy:
- Pre-fabricated cable assemblies prepared before drydock
- Modular installation approach minimizing downtime
- Dedicated installation team working 12-hour shifts
- Daily progress meetings with yard and owner representatives
- Temporary power systems maintained throughout installation
Testing & Commissioning:
- Factory Acceptance Test completed before shipment
- Comprehensive on-board testing protocol
- ABS surveyor witness testing
- Complete as-built documentation package
Results Achieved
Schedule Success: Project completed in 18 days of the 21-day allocated window, providing 3-day buffer for other trades. Zero schedule overruns, saving the operator potential costs exceeding $100,000.
Enhanced Safety: Ground fault monitoring provides early warning of insulation failures, preventing potential electrical fires and personnel hazards.
Improved Efficiency: Modern generator controllers optimize load sharing, reducing fuel consumption by approximately 5% through better engine loading.
Operational Visibility: Digital metering and monitoring provides crew with comprehensive electrical system health information, enabling proactive maintenance.
Full Compliance: Complete ABS approval with all required documentation delivered to owner and class society.
Project Timeline
Engineering & Approval (6 months): Site survey, electrical design, ABS documentation, and approval process.
Manufacturing (8 weeks): Switchboard fabrication, assembly, and factory testing at SDCI facility.
Installation (18 days): Removal of old switchboard, installation of new equipment, cable terminations, and testing.
Commissioning (3 days): System testing, ABS witness testing, and crew familiarization.
Technical Specifications
- Main Switchboard: Custom 3-section design, IP44 rated
- Generator Control: Digital controllers with CANbus networking
- Ground Fault Monitoring: Isolated system with adjustable trip settings
- Circuit Protection: ABB Tmax breakers with electronic trip units
- Metering: Multifunction digital meters with logging capability
- Classification: ABS approved, complete documentation package
- Standards: IEC 61892, ABS Rules for Building and Classing Steel Vessels
Client Testimonial
”SDCI’s meticulous planning and professional execution ensured our drydock stayed on schedule. The new switchboard has transformed our electrical system reliability and the ground fault monitoring provides peace of mind for our crew safety.”
— Chief Engineer, North Atlantic Cargo Operations
Interested in Similar Results?
Discuss how our solutions can be tailored to your vessel requirements.
Request a Technical Review